12 Bravo Group Case Studies


America’s Keswick

EE & Natural Gas Infrastructure Upgrades - America’s Keswick

Description

Services

  • Energy Auditing / Energy Modeling
  • Design-Build Construction
  • Engineering and Construction Oversight
  • Commissioning & Start-up
  • Managed Equipment Incentives

Description

Description

  • Campus conversion to NG including new distribution piping from CR-530
  • Activity Center Boiler Upgrade
  • Activity Center HE Pool Heat
  • RAWS Bldg – Domestic hot Water Upgrades
  • RAWS Bldg – Oil to Gas Conversion
  • Laundry Building (Boiler/DHW)
  • Dormitory Bldg – Boiler/DHW Propane to Gas Conversion

Project Highlights

  • Substantial Utility Cost Savings (20-30%).
  • Extended NG into campus eliminating oil and propane from several buildings.

Project Consistency

  • Meeting Projected Budgets, Deadlines & Timeline
  • Part of a multi-year, multi-project comprehensive energy upgrade strategy for the site

Franklin Institute

Building Energy Performance Program

Description

Services

  • Comprehensive analysis and retro-commissioning of HVAC system

Description

Description

  • Retro-Commissioning program for the existing mechanical systems in the building
  • Data logging / AI assessment of the BMS to determine potential energy savings
  • Developing solution to combine two legacy BMS Systems

Project Highlights

  • Project is In-Progress

Project Consistency

  • Meeting Projected Budgets, Deadlines & Timeline
  • Part of a comprehensive energy upgrade strategy for the site.

CAE Training Center

Chiller Replacement

Description
Services

  • Energy Auditing / Energy Modeling
  • Engineering and Construction Oversight
  • Commissioning & Start-up
  • Managed Equipment Incentives (prescriptive)

Description

Description

  • 470-Ton Chiller Plant Replacement with new variable primary pump and 2-cell cooling tower
  • Converted from Air-Cooled to Water Cooled plant including integrated water side economizer.
  • Site has continuous chiller load related to process cooling for flight simulators

Project Highlights

  • Maintain chilled water capacity to building throughout construction.
  • Substantial Energy Savings

Project Consistency

  • Meeting Projected Budgets, Deadlines & Timeline
  • Part of a multi-phase comprehensive energy strategy for the site.

Covidien

Comprehensive Upgrades

Description

Services

  • Energy Auditing / Energy Modeling
  • Design-Build Construction
  • Engineering and Construction Oversight
  • Commissioning & Start-up
  • Managed Equipment Incentives

Description

  • New 900T Air-Cooled Chiller Plant with 12,600 Ton-hrs of thermal storage
  • Comprehensive LED lighting upgrades.
  • New Air Handling Units
  • Heat Recovery from Process Loads
  • BMS Upgrades & Optimization

Project Highlights

  • Maintained Occupied Building during a comprehensive retrofit project.
  • Duke Energy Partner of the Year (Covidien)

Project Consistency

  • Meeting Projected Budgets, Deadlines & Timeline
  • Part of a multi-site comprehensive energy strategy for the company.